Speedor Cleanroom for car plant project
Nissan Sunderland is one of the largest, most efficient car plants in Europe. On average, the plant has built a Nissan car every two minutes since production started.
The challenge
Following the manufacture of a new paint plant where Hart have a number of doors including several ATEX, Nissan identified a requirement for new repair lines to enable them to carry out both light and heavy repairs and not have to completely repaint the vehicles. This is fast moving environment with the need for a reliable and dust reducing solution.
Project / doors required
- 10 Speedor Cleanroom high speed doors
(More than 200 doors supplied to the plant)
Project challenges
Dust
Dust reduction and ATEX zone. Threat of odour abatement order
Advanced specification
Unique technical capabilities. Mechanical damage from dust
Reliable construction
High quality design to minimise repair needs
The solution
Using a tried and tested solution, Hart installed these “hybrid” Speedor Cleanrooms with ATEX operators within the repair zone. We worked closely with site engineers to give them the solution they require, rather than a door to fit an opening. The Speedor Cleanroom maintains strict air leakage requirements over specified pressure differentials and a non-touch safety light curtain which ensures maximum protection to personnel.
The success
The review
“Speedor is a tried and tested product that is why we keep using them.”
Nissan Motor Manufacturing UK Ltd
Discuss the best product for your requirements
Contact us