Fire and security shutters for London Stadium
London Stadium (formerly and also known as Olympic Stadium) is a multi-purpose outdoor stadium at Queen Elizabeth Olympic Park London.
The challenge
Hart assisted with the specification prior to the award. Technical collaboration was ongoing ensuring that integration and operation of the shutters went smoothly with safety and continuity in mind. Hart was subject to strict working practices and the factory was visited to review progress and audit Hart’s quality system procedures.
Project / doors required
- 21 Fire and security shutters (2010)
- 50+ Fire and security shutters (2015)
Project challenges
Specification
Strict specifications and working practices
Collaboration
Technical integration
Quality Procedures
No room for error
The solution
2010 - Manufacture, supply, deliver and install 21 fire resistant doors and security shutters to the Olympic Main Stadium requiring advance battery backup and operational features.
2015 - Manufacture, supply, deliver and install over 50 security and fire shutters to the new build including kiosk shutters, security entrances and POD buildings surrounding the arena.
The success
The review
“You should be commended for the cooperation, commitment and effort applied by your entire team. From early design discussions to your final commissioning activities of the 50 new shutters onsite, it was a pleasure to work with such proactive and knowledgeable organisation.”
Jon Pepper, Project Manager, Balfour Beatty